Skip to content
01 / For HVAC contractors · since 2016

Electrical for HVAC crews.

02Why partner

Plant-room shaped. Crew-friendly.

The electrical scope around HVAC plant is its own discipline — sized to nameplate, isolated to code, and wired so the mech crew can commission without a queue at the board.

01

Power to plant, day one.

Cable size and circuit count built around the unit nameplate — RLA, MCA, starting current. Sub-board space scoped before the install hits site, not after.

02

Isolation, code-compliant.

AS/NZS 3000 isolation at every outdoor unit, IP-rated for rooftop and external mounts, lockable where the standard asks for it. Documented per circuit.

03

Fire and BMS interfaces.

Smoke-control mode wiring, EWIS fan trip, BMS DI / DO termination — wired neatly, labelled, and commissioned alongside the mech crew.

04

After-hours, rooftop-ready.

Out-of-trading scheduling for occupied sites. We coordinate roof access, hoists, EWPs and base-building rules so commissioning day isn’t the day we discover the lift’s booked out.

03 / NUMBERS

10yrs

Trading in Melbourne

240+

Projects delivered

48h

RFI turnaround

99yr

Workmanship guarantee
Licensed · REC-22849 · Full public liability + workers comp.
05 / Get in touch

Got an HVAC install programme?

Send a brief about your crew, the plant types and the cadence. We'll come back inside one business day with rates and capacity.

Reply inside 1 business day